Modular Scaffold Shoring

Modular Scaffold for shoring – Mock up and Training for KVMRT package V207

Dscaff training program using our SAS modular scaffolding for a shoring application at our Klang warehouse. 10 qualified scaffolders using SAS for the first time erected 360 in 3 hours ( 12 per man / hour ).

The 1.5m bay configuration shown: Dscaff SAS has a Safe Working Load of 64 kNper leg ( AS/NZD and EN standards ). This capacity can be increased to 88Kn when using 1m lifts, ensuring less material and reduced labour time on your project.

  • Modular Scaffolding - Ring Lock Scaffolding
  • Scaffold Shoring
  • Scaffold Shoring

 

SAS MODULAR SCAFFOLDING TRAINING @ PENGERANG (RAPID) JOHOR, MALAYSIA

SAS Modular Scaffolding Training @ Pengerang(RAID) Johor, Malaysia

]Dscaff SAS Modular Scaffolding Training was done for MESEI, SCC(steam cracker complex) Toyo Engineering Package @ RAPID, Pengerang, Johor

 

Photo Gallery

[/vc_column_text]

  • SAS MODULAR SCAFFOLDING TRAINING @ PENGERANG (RAPID) JOHOR, MALAYSIA
  • Ewanizam Scaffold Training
  • SAS MODULAR SCAFFOLDING TRAINING @ PENGERANG (RAPID) JOHOR, MALAYSIA
  • SAS MODULAR SCAFFOLDING TRAINING @ PENGERANG (RAPID) JOHOR, MALAYSIA
  • SAS MODULAR SCAFFOLDING TRAINING @ PENGERANG (RAPID) JOHOR, MALAYSIA
[/vc_column][/vc_row]